Triple

T15296746
Position Surface form Disambiguated ID Type / Status
Subject Mobius M. Mobius E365679 entity
Predicate homeOrganization P12123 FINISHED
Object TVA Headquarters E136 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: TVA Headquarters | Statement: [Mobius M. Mobius, homeOrganization, TVA Headquarters]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: TVA Headquarters
Context triple: [Mobius M. Mobius, homeOrganization, TVA Headquarters]
  • A. Tennessee Valley Authority chosen
    The Tennessee Valley Authority is a federally owned U.S. corporation created during the New Deal to provide regional economic development, flood control, and electricity generation in the Tennessee Valley.
  • B. McArthur Falls Generating Station
    McArthur Falls Generating Station is a hydroelectric power plant on the Winnipeg River in Manitoba, Canada, that generates electricity by harnessing the river’s flow.
  • C. Watts Bar Dam
    Watts Bar Dam is a Tennessee Valley Authority hydroelectric and navigation dam on the Tennessee River in eastern Tennessee.
  • D. Monroe Power Plant
    Monroe Power Plant is a large coal-fired power generating station located on the western shore of Lake Erie in Monroe County, Michigan.
  • E. Beaumont Generating Station
    Beaumont Generating Station is a hydroelectric power plant located on the Saint-Maurice River in Quebec, Canada, contributing to the region’s renewable electricity generation.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: homeOrganization
Context triple: [Mobius M. Mobius, homeOrganization, TVA Headquarters]
  • A. homeCompany chosen
    Indicates that one entity serves as the primary or base company associated with another entity, such as a person or subsidiary.
  • B. parentOrganization
    Indicates that one organization is the higher-level or owning entity in an organizational hierarchy relative to another organization.
  • C. hostsOrganizationType
    Indicates that an entity serves as the hosting venue or platform for organizations of a specified type.
  • D. leftOrganization
    Indicates that an entity has departed from or is no longer affiliated with a particular organization.
  • E. homeTo
    Indicates that a place serves as the primary location, residence, or habitat for a person, group, or thing.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a113ee881908e297a1d38dd79fa completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e036848c1881908fbaaae0216d6d27 completed April 16, 2026, 1:08 a.m.
NED1 Entity disambiguation (via context triple) batch_69feef82f6d08190b809260dda247dfe completed May 9, 2026, 8:25 a.m.
PD Predicate disambiguation batch_69deca935e2c8190b640987ddfc542b9 completed April 14, 2026, 11:15 p.m.
Created at: April 10, 2026, 3:15 a.m.