Triple

T1529497
Position Surface form Disambiguated ID Type / Status
Subject Indira Gandhi Canal E32407 entity
Predicate majorPhaseCompletion P29875 FINISHED
Object 1980s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1980s | Statement: [Indira Gandhi Canal, majorPhaseCompletion, 1980s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: majorPhaseCompletion
Context triple: [Indira Gandhi Canal, majorPhaseCompletion, 1980s]
  • A. mainPhase
    Indicates that an event, action, or state occurs during the primary or central phase of a larger process or sequence.
  • B. majorRebuildCompleted
    Indicates that a significant reconstruction or overhaul of an entity has been fully completed.
  • C. majorCapturePhase
    Indicates a significant or primary stage in a capture process where the main act of seizing, acquiring, or taking control occurs.
  • D. majorOperation
    Indicates that one entity performs or undergoes a significant, large-scale, or primary operation or procedure involving another entity or context.
  • E. secondPhase
    Indicates that an entity is in, or has progressed to, the second phase or stage of a multi-phase process or sequence.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885ea86308190998f6bc14bb91f8e completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a933ddc5a881909cdf503f2bc29bd4 completed March 5, 2026, 7:42 a.m.
PD Predicate disambiguation batch_69a907ae8f688190ad9000ea1e018585 completed March 5, 2026, 4:33 a.m.
PDg Predicate description generation batch_69a933dce3488190b20f0e3d37d16371 completed March 5, 2026, 7:42 a.m.
Created at: March 4, 2026, 7:26 p.m.