Triple
T15283610
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cacor aqueduct |
E365337
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water bridge |
C11264
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water bridge Context triple: [Cacor aqueduct, instanceOf, water bridge]
-
A.
river bridge
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
B.
dam bridge
A dam bridge is a structure that combines the functions of a dam for water retention and control with a bridge that provides a transportation route across the impounded water or river.
-
C.
cross-sea bridge
A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
-
D.
ornamental bridge
An ornamental bridge is a decorative structure, often smaller in scale than functional bridges, designed primarily to enhance the aesthetic appeal of a landscape or garden while sometimes providing light pedestrian passage.
-
E.
canal bridge
chosen
A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a103d9081908c1ea6c4c73ac8e3 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:15 a.m.