Triple
T15278976
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kita Bisan-Seto Bridge |
E365219
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge in Japan |
C22181
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge in Japan Context triple: [Kita Bisan-Seto Bridge, instanceOf, bridge in Japan]
-
A.
bridge in Taiwan
A bridge in Taiwan is a structural construction that spans physical obstacles such as rivers, valleys, or roads within Taiwan’s territory to provide transportation routes for vehicles, pedestrians, or railways.
-
B.
bridge in the Philippines
A bridge in the Philippines is a man-made structure that spans physical obstacles such as bodies of water, valleys, or roads within the Philippine archipelago to facilitate transportation and connectivity between different areas.
-
C.
canal bridge
A canal bridge is a structure that carries a canal or waterway over an obstacle such as a road, river, or valley, allowing uninterrupted navigation.
-
D.
river bridge
chosen
A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
-
E.
tram bridge
A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a103d9081908c1ea6c4c73ac8e3 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:14 a.m.