Triple
T15271402
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Centennial Challenges Program |
E365028
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | NASA prize competition program |
C33184
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: NASA prize competition program Context triple: [Centennial Challenges Program, instanceOf, NASA prize competition program]
-
A.
NASA program infrastructure
NASA program infrastructure encompasses the organizational structures, facilities, technologies, processes, and support systems that enable the planning, execution, and management of NASA’s missions and research programs.
-
B.
NASA program component
chosen
A NASA program component is a distinct organizational, technical, or operational element within a broader NASA program that contributes specific capabilities, resources, or functions toward achieving the program’s mission objectives.
-
C.
Planetary Society program
A Planetary Society program is an organized initiative that advances public engagement, scientific research, and advocacy related to planetary exploration and space science.
-
D.
NASA spacecraft program
A NASA spacecraft program is an organized initiative that designs, develops, launches, and operates one or more spacecraft to achieve specific scientific, exploratory, or technological objectives in space.
-
E.
STEM outreach award
A STEM outreach award recognizes individuals or organizations that have made outstanding efforts to engage, educate, and inspire the public—especially underrepresented groups—in science, technology, engineering, and mathematics.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0f08408190b3c3259ae35d79d2 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:14 a.m.