Triple

T15269276
Position Surface form Disambiguated ID Type / Status
Subject Gove alumina refinery E364977 entity
Predicate instanceOf P0 FINISHED
Object alumina refinery C36206 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: alumina refinery
Context triple: [Gove alumina refinery, instanceOf, alumina refinery]
  • A. oil processing facility
    An oil processing facility is an industrial complex where crude oil is received, separated, treated, and refined into usable products such as fuels, lubricants, and feedstocks under controlled conditions.
  • B. uranium processing facility
    A uranium processing facility is an industrial plant where uranium ore is refined, converted, and prepared into nuclear-grade materials for use in fuel production or other nuclear applications.
  • C. ExxonMobil facility
    An ExxonMobil facility is a physical site owned or operated by ExxonMobil where petroleum, natural gas, or related chemical products are explored, produced, processed, stored, or distributed.
  • D. sugar mill
    A sugar mill is an industrial facility where sugarcane or sugar beets are processed to extract, refine, and produce sugar and related by-products.
  • E. uranium enrichment facility
    A uranium enrichment facility is an industrial complex that increases the concentration of the fissile isotope U-235 in uranium to produce fuel for nuclear reactors or material for nuclear weapons.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0f08408190b3c3259ae35d79d2 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:14 a.m.