Triple

T15269273
Position Surface form Disambiguated ID Type / Status
Subject Gove bauxite mine E364977 entity
Predicate instanceOf P0 FINISHED
Object bauxite mine C28960 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bauxite mine
Context triple: [Gove bauxite mine, instanceOf, bauxite mine]
  • A. coal mine
    A coal mine is an industrial site where coal is extracted from underground or surface deposits for use as fuel and raw material.
  • B. copper mine
    A copper mine is an industrial site where copper ore is extracted from the earth, processed, and refined for use in manufacturing and construction.
  • C. mining basin
    A mining basin is a geographic area characterized by extensive mineral deposits and concentrated mining activities, often including associated infrastructure and environmental impacts.
  • D. iron ore mine
    An iron ore mine is an industrial site where iron-rich rock is extracted from the earth, processed, and prepared for use in steel production and other iron-based manufacturing.
  • E. hard-rock mine chosen
    A hard-rock mine is an underground or open-pit excavation where solid rock containing valuable minerals or metals is drilled, blasted, and processed for extraction.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0f08408190b3c3259ae35d79d2 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:14 a.m.