Triple

T15266786
Position Surface form Disambiguated ID Type / Status
Subject Collinsville, Illinois E364920 entity
Predicate locatedOn P40 FINISHED
Object Interstate 55 NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Interstate 55 | Statement: [Collinsville, Illinois, locatedOn, Interstate 55]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Interstate 55
Context triple: [Collinsville, Illinois, locatedOn, Interstate 55]
  • A. Interstate 55 chosen
    Interstate 55 is a major north–south U.S. highway running from Louisiana to Illinois, connecting cities such as New Orleans, Memphis, and Chicago.
  • B. Interstate 49
    Interstate 49 is a major north–south U.S. Interstate Highway running through multiple states in the central United States, including Missouri.
  • C. Interstate 59
    Interstate 59 is a major U.S. highway running from Louisiana to Georgia, serving as a key north–south transportation corridor through the Deep South.
  • D. Interstate 595
    Interstate 595 is an east–west auxiliary Interstate Highway in South Florida that links Interstate 75 and the Sawgrass Expressway with Fort Lauderdale and the Port Everglades area.
  • E. Interstate 65
    Interstate 65 is a major north–south U.S. highway running through the central United States, connecting the Gulf Coast to the Midwest and serving key cities such as Mobile, Birmingham, Nashville, and Indianapolis.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0f08408190b3c3259ae35d79d2 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e00851c5b88190a296b6a105d3ee30 completed April 15, 2026, 9:51 p.m.
Created at: April 10, 2026, 3:14 a.m.