Triple

T15265571
Position Surface form Disambiguated ID Type / Status
Subject Coosawattee River E364892 entity
Predicate hasDam P8736 FINISHED
Object Carters Dam NE ONDG

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Carters Dam | Statement: [Coosawattee River, hasDam, Carters Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Carters Dam
Context triple: [Coosawattee River, hasDam, Carters Dam]
  • A. Brantley Dam
    Brantley Dam is a major flood-control and irrigation reservoir structure on the Pecos River in southeastern New Mexico.
  • B. Rollins Dam
    Rollins Dam is a concrete gravity dam in Nevada County, California, that creates Rollins Reservoir for water storage, hydroelectric power generation, and recreation on the Bear River.
  • C. Falls Dam
    Falls Dam is a hydroelectric and flood-control structure on the Yadkin River in North Carolina that impounds Falls Reservoir.
  • D. Tillery Dam
    Tillery Dam is a hydroelectric dam on the Yadkin River in North Carolina that forms Lake Tillery and helps generate power and manage water resources in the region.
  • E. Barker Dam
    Barker Dam is a historic water reservoir and popular scenic spot located within Joshua Tree National Park in California.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Carters Dam
Triple: [Coosawattee River, hasDam, Carters Dam]
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Carters Dam
Target entity description: Carters Dam is a major earthen dam in northwestern Georgia, United States, known for creating Carters Lake and providing hydroelectric power, flood control, and recreational opportunities.
  • A. Brantley Dam
    Brantley Dam is a major flood-control and irrigation reservoir structure on the Pecos River in southeastern New Mexico.
  • B. Rollins Dam
    Rollins Dam is a concrete gravity dam in Nevada County, California, that creates Rollins Reservoir for water storage, hydroelectric power generation, and recreation on the Bear River.
  • C. Falls Dam
    Falls Dam is a hydroelectric and flood-control structure on the Yadkin River in North Carolina that impounds Falls Reservoir.
  • D. Tillery Dam
    Tillery Dam is a hydroelectric dam on the Yadkin River in North Carolina that forms Lake Tillery and helps generate power and manage water resources in the region.
  • E. Barker Dam
    Barker Dam is a historic water reservoir and popular scenic spot located within Joshua Tree National Park in California.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0f08408190b3c3259ae35d79d2 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e00851c5b88190a296b6a105d3ee30 completed April 15, 2026, 9:51 p.m.
NED1 Entity disambiguation (via context triple) batch_6a01953c493c819084850ab8e7f0d261 completed May 11, 2026, 8:37 a.m.
NEDg Description generation batch_6a01963971248190b5e2b0b77eb7cbfe in_progress May 11, 2026, 8:41 a.m.
Created at: April 10, 2026, 3:14 a.m.