Triple

T15265276
Position Surface form Disambiguated ID Type / Status
Subject Tannochside E364882 entity
Predicate hasTransportConnection P845 FINISHED
Object M8 motorway NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M8 motorway | Statement: [Tannochside, hasTransportConnection, M8 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M8 motorway
Context triple: [Tannochside, hasTransportConnection, M8 motorway]
  • A. M8 motorway chosen
    The M8 motorway is a major Scottish highway linking the cities of Glasgow and Edinburgh and serving as a key east–west transport corridor across the Central Belt.
  • B. M8 motorway
    The M8 motorway is a major Irish highway linking Cork to Dublin, forming a key part of the country’s primary inter-urban road network.
  • C. M7 motorway
    The M7 motorway is a major Hungarian highway that links Budapest with Lake Balaton and continues toward the Croatian border, serving as a key route in southwestern Hungary.
  • D. M7 motorway
    The M7 motorway is a major Irish route connecting Dublin with Limerick and serving as a key part of the country’s primary east–west transport corridor.
  • E. M9 motorway
    The M9 motorway is a major Scottish highway connecting Edinburgh to Stirling and the Highlands, serving as a key transport route through central Scotland.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0f08408190b3c3259ae35d79d2 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e00851c5b88190a296b6a105d3ee30 completed April 15, 2026, 9:51 p.m.
Created at: April 10, 2026, 3:14 a.m.