Triple
T15254259
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bishopbriggs |
E364603
|
entity |
| Predicate | roadServedBy |
P385
|
FINISHED |
| Object | M80 motorway |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M80 motorway | Statement: [Bishopbriggs, roadServedBy, M80 motorway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: M80 motorway Context triple: [Bishopbriggs, roadServedBy, M80 motorway]
-
A.
M80 motorway
chosen
The M80 motorway is a major road in Scotland connecting Glasgow to Stirling and forming part of the primary route between central Scotland and the north.
-
B.
M90 motorway
The M90 motorway is a major Scottish highway linking Edinburgh to Perth and serving as a key north–south route in eastern Scotland.
-
C.
M898 motorway
The M898 motorway is a short spur route in Scotland that connects the M8 motorway to the Erskine Bridge over the River Clyde.
-
D.
M876 motorway
The M876 motorway is a short Scottish motorway that links the M80 and M9 near Falkirk, providing access towards Kincardine and the Forth Valley.
-
E.
M48 motorway
The M48 motorway is a major road in the United Kingdom that provides a key cross-border route between England and Wales via the Severn Estuary.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0dde7481908fc64d1e82d5d20d |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e007f8cb308190933c4478aa096e24 |
completed | April 15, 2026, 9:49 p.m. |
Created at: April 10, 2026, 3:13 a.m.