Triple
T15241741
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Grand |
E364271
|
entity |
| Predicate | line |
P1293
|
FINISHED |
| Object | Red Line (CTA) |
E252488
|
NE FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Red Line (CTA) | Statement: [Grand, line, Red Line (CTA)]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Red Line (CTA) Context triple: [Grand, line, Red Line (CTA)]
-
A.
Yellow Line (CTA)
The Yellow Line (CTA), also known as the Skokie Swift, is a short Chicago Transit Authority rapid transit route that runs between Howard and Skokie without serving downtown Chicago.
-
B.
Orange Line (CTA)
The Orange Line (CTA) is a rapid transit route in Chicago that connects the Loop with Midway International Airport and several Southwest Side neighborhoods.
-
C.
Red Line (Chicago "L")
chosen
The Red Line is a major rapid transit route of the Chicago "L" system, running north–south through the city and operating 24 hours a day.
-
D.
Purple Line (CTA)
The Purple Line (CTA) is a rapid transit route in Chicago primarily serving the northern suburbs and Evanston, with express service to downtown during weekday rush hours.
-
E.
CTA Red Line
The CTA Red Line is a major rapid transit route in Chicago that runs north–south through the city, including service through the downtown Loop.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0dde7481908fc64d1e82d5d20d |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e007dcc33081908545ea1a1d2c19fe |
completed | April 15, 2026, 9:49 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69feef6c25808190af46f4cab56f133c |
completed | May 9, 2026, 8:25 a.m. |
Created at: April 10, 2026, 3:13 a.m.