Triple

T15238392
Position Surface form Disambiguated ID Type / Status
Subject Malaysia LNG complex in Bintulu E364189 entity
Predicate instanceOf P0 FINISHED
Object liquefied natural gas production facility C34880 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: liquefied natural gas production facility
Context triple: [Malaysia LNG complex in Bintulu, instanceOf, liquefied natural gas production facility]
  • A. liquefied natural gas project chosen
    A liquefied natural gas project is a large-scale industrial development that encompasses the extraction, processing, liquefaction, storage, and transportation infrastructure required to produce and export natural gas in liquid form.
  • B. liquefied natural gas company
    A liquefied natural gas company is an organization that explores, produces, processes, liquefies, transports, and/or markets natural gas in its liquid form for efficient storage and global distribution.
  • C. natural gas storage facility
    A natural gas storage facility is an engineered site where natural gas is injected, stored (often in underground formations or large tanks), and withdrawn to balance supply and demand, ensure reliability, and support market operations.
  • D. oil processing facility
    An oil processing facility is an industrial complex where crude oil is received, separated, treated, and refined into usable products such as fuels, lubricants, and feedstocks under controlled conditions.
  • E. offshore petroleum export facility
    An offshore petroleum export facility is a marine-based installation that receives, stores, and transfers produced oil or gas from offshore fields to tankers or pipelines for transport to onshore markets.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0dde7481908fc64d1e82d5d20d completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:12 a.m.