Triple

T15237922
Position Surface form Disambiguated ID Type / Status
Subject CBM Engineers E364176 entity
Predicate instanceOf P0 FINISHED
Object structural engineering company C426 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: structural engineering company
Context triple: [CBM Engineers, instanceOf, structural engineering company]
  • A. engineering firm chosen
    An engineering firm is a business organization that provides professional engineering services—such as design, analysis, consulting, and project management—to plan, develop, and implement technical solutions for clients in various industries.
  • B. engineering structure
    An engineering structure is a designed and constructed system of connected components that safely resists and transmits loads to fulfill a specific functional purpose in the built environment.
  • C. construction management firm
    A construction management firm is a professional organization that plans, coordinates, and oversees construction projects from inception to completion, ensuring they are delivered on time, within budget, and to specified quality and safety standards.
  • D. architecture and design firm
    A professional company that plans, designs, and often oversees the construction of buildings and interior spaces, integrating aesthetics, functionality, and client needs.
  • E. construction and trading company
    A construction and trading company is a business entity that both executes building and infrastructure projects and engages in the procurement, sale, and distribution of construction-related materials, equipment, or goods.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0dde7481908fc64d1e82d5d20d completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:12 a.m.