Triple

T1523526
Position Surface form Disambiguated ID Type / Status
Subject STS-1 E32282 entity
Predicate firstCrewedFlightOf P16904 FINISHED
Object Space Shuttle program E5108 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Space Shuttle program | Statement: [STS-1, firstCrewedFlightOf, Space Shuttle program]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Space Shuttle program
Context triple: [STS-1, firstCrewedFlightOf, Space Shuttle program]
  • A. NASA Space Shuttle program chosen
    The NASA Space Shuttle program was the United States' reusable spacecraft initiative that operated from 1981 to 2011, enabling routine human spaceflight, satellite deployment, and International Space Station construction and servicing.
  • B. Skylab program
    The Skylab program was NASA’s first space station initiative, focused on long-duration human spaceflight and scientific research in Earth orbit during the 1970s.
  • C. Space Station Freedom program
    The Space Station Freedom program was a canceled NASA-led initiative from the 1980s–1990s to build a permanently crewed U.S. space station in low Earth orbit, whose plans and technologies were later folded into the International Space Station.
  • D. International Space Station program
    The International Space Station program is a multinational collaborative effort to design, build, and operate a permanently crewed orbital research laboratory in low Earth orbit.
  • E. Gemini program
    The Gemini program was NASA’s second human spaceflight project in the 1960s, designed to develop critical space travel techniques such as orbital rendezvous, docking, and long-duration missions that paved the way for the Apollo Moon landings.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: firstCrewedFlightOf
Context triple: [STS-1, firstCrewedFlightOf, Space Shuttle program]
  • A. firstCrewedFlightDate
    Indicates the calendar date on which an entity undertook its first flight carrying human crew.
  • B. firstFlight
    Indicates that the associated event or record corresponds to the earliest or initial flight taken or performed by the referenced entity.
  • C. firstCrewedMission chosen
    Indicates that the mission is the first instance in which humans were onboard or directly participated as crew.
  • D. firstFlownAt
    Indicates the date or time at which something (typically an aircraft or spacecraft) was first flown.
  • E. firstCrewedTestFlightCrew
    Indicates that the subject is a member of the crew on the first crewed test flight of the referenced vehicle or mission.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885e9b0ac819093a9806ad0efc82c completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a93d4756888190bf3872154de11539 completed March 5, 2026, 8:22 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad401616ec81908edd9dcb9f4a0184 completed March 8, 2026, 9:23 a.m.
PD Predicate disambiguation batch_69a907ac7ea081908dd95bb5cc3b9847 completed March 5, 2026, 4:33 a.m.
Created at: March 4, 2026, 7:26 p.m.