Triple
T1523491
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Space Transportation System |
E32281
|
entity |
| Predicate | informalName |
P22212
|
FINISHED |
| Object | Space Shuttle program |
E5108
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Space Shuttle program | Statement: [Space Transportation System, informalName, Space Shuttle program]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Space Shuttle program Context triple: [Space Transportation System, informalName, Space Shuttle program]
-
A.
NASA Space Shuttle program
chosen
The NASA Space Shuttle program was the United States' reusable spacecraft initiative that operated from 1981 to 2011, enabling routine human spaceflight, satellite deployment, and International Space Station construction and servicing.
-
B.
Skylab program
The Skylab program was NASA’s first space station initiative, focused on long-duration human spaceflight and scientific research in Earth orbit during the 1970s.
-
C.
Space Station Freedom program
The Space Station Freedom program was a canceled NASA-led initiative from the 1980s–1990s to build a permanently crewed U.S. space station in low Earth orbit, whose plans and technologies were later folded into the International Space Station.
-
D.
International Space Station program
The International Space Station program is a multinational collaborative effort to design, build, and operate a permanently crewed orbital research laboratory in low Earth orbit.
-
E.
Gemini program
The Gemini program was NASA’s second human spaceflight project in the 1960s, designed to develop critical space travel techniques such as orbital rendezvous, docking, and long-duration missions that paved the way for the Apollo Moon landings.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: informalName Context triple: [Space Transportation System, informalName, Space Shuttle program]
-
A.
notOfficialNameOf
Indicates that a given name or label is used for an entity but is not its official or formally recognized name.
-
B.
nameOf
Indicates that one entity is the name or designation of another entity.
-
C.
popularName
chosen
Indicates that the object is a commonly used or widely recognized name or nickname for the subject.
-
D.
formerName
Indicates that an entity was previously known by a different name in the past.
-
E.
givenNameFor
Indicates that one entity is the personal first name assigned to or used for another entity.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69a885e9b0ac819093a9806ad0efc82c |
completed | March 4, 2026, 7:20 p.m. |
| NER | Named-entity recognition | batch_69a93d4756888190bf3872154de11539 |
completed | March 5, 2026, 8:22 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69ad308f99d8819095c2ed404d4170b3 |
completed | March 8, 2026, 8:17 a.m. |
| PD | Predicate disambiguation | batch_69a907ac7ea081908dd95bb5cc3b9847 |
completed | March 5, 2026, 4:33 a.m. |
Created at: March 4, 2026, 7:26 p.m.