Triple
T15217242
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New Hope Branch |
E363667
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former railroad branch line |
C15590
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former railroad branch line Context triple: [New Hope Branch, instanceOf, former railroad branch line]
-
A.
former railway facility
A former railway facility is a decommissioned or repurposed site that once served operational functions for rail transport, such as stations, depots, yards, or maintenance buildings.
-
B.
former transit line
chosen
A former transit line is a previously operational public transportation route, such as a bus, tram, or rail line, that has been permanently discontinued or replaced.
-
C.
defunct railroad
A defunct railroad is a former railway company or line that has ceased operations, often leaving behind abandoned tracks, rights-of-way, or repurposed infrastructure.
-
D.
former railway station
A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
-
E.
narrow-gauge railway line
A narrow-gauge railway line is a railroad whose track gauge is significantly smaller than the standard gauge, typically used in regions with difficult terrain, lower construction costs, or specialized transport needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0ce24c81909c4d3b6475548c95 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:11 a.m.