Triple
T15215136
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gare de Bordeaux-Saint-Jean (works and extensions) |
E363618
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure modernization project |
C17897
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure modernization project Context triple: [Gare de Bordeaux-Saint-Jean (works and extensions), instanceOf, infrastructure modernization project]
-
A.
infrastructure project
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
stadium modernization project
A stadium modernization project is a coordinated initiative to upgrade an existing sports venue’s infrastructure, technology, amenities, and safety features to meet contemporary standards and enhance the overall spectator and event experience.
-
C.
railway modernisation project
chosen
A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
-
D.
distribution modernization initiative
A distribution modernization initiative is a coordinated program to upgrade, digitize, and optimize distribution networks, processes, and technologies to improve reliability, efficiency, and customer service.
-
E.
modernization package
A modernization package is a bundled set of upgrades, tools, and services designed to update an existing system, product, or infrastructure to contemporary standards in performance, usability, and maintainability.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0b78bc8190b6e5ad51a2c4cfc5 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:11 a.m.