Triple

T15215136
Position Surface form Disambiguated ID Type / Status
Subject Gare de Bordeaux-Saint-Jean (works and extensions) E363618 entity
Predicate instanceOf P0 FINISHED
Object infrastructure modernization project C17897 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: infrastructure modernization project
Context triple: [Gare de Bordeaux-Saint-Jean (works and extensions), instanceOf, infrastructure modernization project]
  • A. infrastructure project
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. stadium modernization project
    A stadium modernization project is a coordinated initiative to upgrade an existing sports venue’s infrastructure, technology, amenities, and safety features to meet contemporary standards and enhance the overall spectator and event experience.
  • C. railway modernisation project chosen
    A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
  • D. distribution modernization initiative
    A distribution modernization initiative is a coordinated program to upgrade, digitize, and optimize distribution networks, processes, and technologies to improve reliability, efficiency, and customer service.
  • E. modernization package
    A modernization package is a bundled set of upgrades, tools, and services designed to update an existing system, product, or infrastructure to contemporary standards in performance, usability, and maintainability.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0b78bc8190b6e5ad51a2c4cfc5 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:11 a.m.