Triple

T15215134
Position Surface form Disambiguated ID Type / Status
Subject Gare de Bordeaux-Saint-Jean (works and extensions) E363618 entity
Predicate instanceOf P0 FINISHED
Object railway station expansion project C17897 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: railway station expansion project
Context triple: [Gare de Bordeaux-Saint-Jean (works and extensions), instanceOf, railway station expansion project]
  • A. railway modernisation project chosen
    A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
  • B. rapid transit expansion project
    A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
  • C. light rail expansion project
    A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
  • D. future railway station
    A future railway station is a conceptual transportation hub designed with advanced technologies, sustainable infrastructure, and adaptable spaces to efficiently manage high-capacity, multimodal passenger and freight flows.
  • E. railway station area
    A railway station area is the surrounding zone of a train station that includes platforms, tracks, access roads, passenger facilities, and adjacent public or commercial spaces supporting rail transport activities.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0b78bc8190b6e5ad51a2c4cfc5 completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:11 a.m.