Triple
T15215134
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Gare de Bordeaux-Saint-Jean (works and extensions) |
E363618
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway station expansion project |
C17897
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway station expansion project Context triple: [Gare de Bordeaux-Saint-Jean (works and extensions), instanceOf, railway station expansion project]
-
A.
railway modernisation project
chosen
A railway modernisation project is an initiative that upgrades existing rail infrastructure, technology, and operations to improve capacity, safety, efficiency, and passenger experience.
-
B.
rapid transit expansion project
A rapid transit expansion project is a coordinated planning, design, and construction effort to extend or enhance high-capacity public transportation networks to improve urban mobility and accommodate future demand.
-
C.
light rail expansion project
A light rail expansion project is a coordinated planning, design, and construction effort to extend an existing light rail transit system’s routes, capacity, and supporting infrastructure to serve additional areas and riders.
-
D.
future railway station
A future railway station is a conceptual transportation hub designed with advanced technologies, sustainable infrastructure, and adaptable spaces to efficiently manage high-capacity, multimodal passenger and freight flows.
-
E.
railway station area
A railway station area is the surrounding zone of a train station that includes platforms, tracks, access roads, passenger facilities, and adjacent public or commercial spaces supporting rail transport activities.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0b78bc8190b6e5ad51a2c4cfc5 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:11 a.m.