Triple

T15208814
Position Surface form Disambiguated ID Type / Status
Subject Letchworth Garden City railway station E363458 entity
Predicate connectsTo P845 FINISHED
Object Cambridge E620421 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Cambridge | Statement: [Letchworth Garden City railway station, connectsTo, Cambridge]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Cambridge
Context triple: [Letchworth Garden City railway station, connectsTo, Cambridge]
  • A. Cambridge
    Cambridge is a city in southwestern Ontario, Canada, known as part of the Regional Municipality of Waterloo and situated along the Grand River.
  • B. Cambridge
    Cambridge is a town in New Zealand known for its picturesque rural setting, equestrian culture, and proximity to the Waikato River.
  • C. Cambridge
    Cambridge is a historic and academically renowned city in Massachusetts, best known as the home of Harvard University and the Massachusetts Institute of Technology (MIT).
  • D. Cambridge
    Cambridge is a prominent city in the Greater Boston area best known as the home of Harvard University and the Massachusetts Institute of Technology (MIT).
  • E. CAMBRIDGE chosen
    Cambridge is a historic university city in eastern England, renowned for the University of Cambridge and its rich academic and architectural heritage.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0b78bc8190b6e5ad51a2c4cfc5 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e006b8e2788190bd1831762e4181ae completed April 15, 2026, 9:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69fed33dbda08190a10ba81082d0d183 completed May 9, 2026, 6:25 a.m.
Created at: April 10, 2026, 3:11 a.m.