Triple
T15204818
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ohio State Route 331 |
E363361
|
entity |
| Predicate | abbreviation |
P43
|
FINISHED |
| Object |
SR 331
SR 331 is a state highway in Ohio that serves as a regional connector route through the eastern part of the state.
|
E1147806
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SR 331 | Statement: [Ohio State Route 331, abbreviation, SR 331]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: SR 331 Context triple: [Ohio State Route 331, abbreviation, SR 331]
-
A.
SR 31
SR 31 is a state highway in northeastern Washington that runs north–south from near the town of Metaline Falls to the Canadian border.
-
B.
SR 305
SR 305 is a state highway in Washington that connects the city of Poulsbo with Bainbridge Island and the Seattle–Bainbridge Island ferry terminal.
-
C.
SR 309
SR 309 is a state highway in Georgia that serves as a regional connector route within the state's road network.
-
D.
SR 316
SR 316 is a major east–west state highway in Georgia that connects the Atlanta metropolitan area with the city of Athens.
-
E.
SR 35
SR 35 is a Tennessee state highway that serves as a primary north–south transportation route connecting several communities in the eastern part of the state.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: SR 331 Triple: [Ohio State Route 331, abbreviation, SR 331]
Generated description
SR 331 is a state highway in Ohio that serves as a regional connector route through the eastern part of the state.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: SR 331 Target entity description: SR 331 is a state highway in Ohio that serves as a regional connector route through the eastern part of the state.
-
A.
SR 31
SR 31 is a state highway in northeastern Washington that runs north–south from near the town of Metaline Falls to the Canadian border.
-
B.
SR 305
SR 305 is a state highway in Washington that connects the city of Poulsbo with Bainbridge Island and the Seattle–Bainbridge Island ferry terminal.
-
C.
SR 309
SR 309 is a state highway in Georgia that serves as a regional connector route within the state's road network.
-
D.
SR 316
SR 316 is a major east–west state highway in Georgia that connects the Atlanta metropolitan area with the city of Athens.
-
E.
SR 35
SR 35 is a Tennessee state highway that serves as a primary north–south transportation route connecting several communities in the eastern part of the state.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0b78bc8190b6e5ad51a2c4cfc5 |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e006b7964c8190bc8dc3444b94f15e |
completed | April 15, 2026, 9:44 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69feef687bdc819090ec8a4e1af9f422 |
completed | May 9, 2026, 8:25 a.m. |
| NEDg | Description generation | batch_69fef036896c8190b9dd8a87198f3783 |
completed | May 9, 2026, 8:28 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69fef0f651548190a965559aa93d4b54 |
completed | May 9, 2026, 8:31 a.m. |
Created at: April 10, 2026, 3:11 a.m.