Triple
T15202417
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kaufman Astoria Studios |
E363300
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | production complex |
C399
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: production complex Context triple: [Kaufman Astoria Studios, instanceOf, production complex]
-
A.
production facility
A production facility is a physical site equipped with machinery, resources, and personnel dedicated to manufacturing goods or processing materials at scale.
-
B.
industrial production system
An industrial production system is an organized arrangement of people, machines, materials, methods, and information designed to efficiently transform inputs into standardized goods or services at scale.
-
C.
manufacturing plant
A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
-
D.
industrial and residential complex
A mixed-use development that integrates industrial facilities with residential housing, designed to support both production activities and everyday living within a coordinated, shared environment.
-
E.
building complex
chosen
A building complex is a group of interconnected or related structures on a shared site that function together as a unified facility or environment.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0b78bc8190b6e5ad51a2c4cfc5 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:10 a.m.