Triple
T15200883
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Écluse de Montech |
E363263
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure de transport fluvial |
C16044
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure de transport fluvial Context triple: [Écluse de Montech, instanceOf, infrastructure de transport fluvial]
-
A.
navigable waterway
A navigable waterway is a natural or artificial body of water, such as a river, canal, or channel, that is deep and wide enough for vessels to travel safely for transportation or commerce.
-
B.
floating market
A floating market is a marketplace where vendors sell goods, often fresh produce and local foods, directly from boats on rivers or canals.
-
C.
canal infrastructure
chosen
Canal infrastructure encompasses the engineered systems, structures, and facilities—such as channels, locks, dams, embankments, and control mechanisms—designed to manage and support waterborne transport, irrigation, drainage, and water regulation along artificial waterways.
-
D.
maritime passage
A maritime passage is a navigable sea route or waterway that connects larger bodies of water, enabling the movement of ships and maritime traffic between regions.
-
E.
waterway network
A waterway network is an interconnected system of natural and artificial water channels (such as rivers, canals, and streams) designed or utilized for the movement, distribution, and management of water and waterborne transport.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0b78bc8190b6e5ad51a2c4cfc5 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:10 a.m.