Triple

T15198772
Position Surface form Disambiguated ID Type / Status
Subject San Luis Canal E363208 entity
Predicate waterSourceProject P117091 FINISHED
Object Central Valley Project E9027 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Central Valley Project | Statement: [San Luis Canal, waterSourceProject, Central Valley Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Central Valley Project
Context triple: [San Luis Canal, waterSourceProject, Central Valley Project]
  • A. Central Valley Project chosen
    The Central Valley Project is a large-scale federal water management system in California that stores and delivers water for agriculture, cities, and environmental uses across the Central Valley.
  • B. Truckee-Carson Project
    The Truckee-Carson Project is a major U.S. federal water management and irrigation initiative in western Nevada that diverts and distributes water from the Truckee and Carson rivers to support agriculture and regional development.
  • C. State Water Project
    The State Water Project is a massive California water storage and delivery system that transports water from northern sources to agricultural, urban, and industrial users across the state, including the Central Valley.
  • D. Columbia Basin Project
    The Columbia Basin Project is a large-scale irrigation and hydroelectric development in central Washington State that distributes water and power from the Grand Coulee Dam to support agriculture, industry, and communities across the region.
  • E. Feather River Project
    The Feather River Project is a major California water development and hydroelectric initiative centered on the Feather River watershed, providing water storage, power generation, and flood control for the state.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: waterSourceProject
Context triple: [San Luis Canal, waterSourceProject, Central Valley Project]
  • A. waterSource
    Indicates that one entity serves as the source or provider of water for another entity.
  • B. waterSourceState
    Indicates the condition or status of a given water source (e.g., whether it is available, functional, or in a particular operational state).
  • C. waterSourceDedicatedTo
    Indicates that a particular water source is specifically allocated or reserved for a designated use, group, or purpose.
  • D. waterProjectComponentType
    Indicates the specific functional type or category that a component belongs to within a water-related project.
  • E. waterInfrastructure
    Indicates the existence, development, or management of systems and facilities that supply, store, treat, or distribute water between entities.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a0b78bc8190b6e5ad51a2c4cfc5 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e006b476208190a5119710c518bb1f completed April 15, 2026, 9:44 p.m.
NED1 Entity disambiguation (via context triple) batch_69fef88dd1fc8190b6cdabf6c24c2712 completed May 9, 2026, 9:04 a.m.
PD Predicate disambiguation batch_69deb97bd8bc8190b2ad4888f97cf963 completed April 14, 2026, 10:02 p.m.
PDg Predicate description generation batch_69dec72059c08190a34f513a00185b08 completed April 14, 2026, 11 p.m.
Created at: April 10, 2026, 3:10 a.m.