Triple

T1519874
Position Surface form Disambiguated ID Type / Status
Subject United States home front during World War II E32202 entity
Predicate keyProgram P30089 FINISHED
Object Victory Program
The Victory Program was a comprehensive U.S. military mobilization and production plan developed before America’s entry into World War II to prepare the nation for large-scale global conflict.
E174207 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Victory Program | Statement: [United States home front during World War II, keyProgram, Victory Program]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Victory Program
Context triple: [United States home front during World War II, keyProgram, Victory Program]
  • A. Vanguard program
    The Vanguard program was an early U.S. Navy–run satellite project during the Cold War that aimed to launch some of the first American satellites into Earth orbit as part of the International Geophysical Year.
  • B. Phoenix Program
    The Phoenix Program was a controversial covert counterinsurgency and intelligence operation run by the United States and South Vietnamese governments during the Vietnam War, aimed at identifying, capturing, or eliminating Viet Cong infrastructure.
  • C. Victory
    Victory is a public transit station code used within the Dallas Area Rapid Transit (DART) system, identifying Victory Station in Dallas, Texas.
  • D. The Transitional Program
    The Transitional Program is Leon Trotsky’s 1938 manifesto for the Fourth International, outlining a strategy of transitional demands intended to bridge workers’ immediate struggles with the goal of socialist revolution.
  • E. Upward Bound
    Upward Bound is a U.S. federal TRIO program that provides academic support and college preparation services to low-income and first-generation high school students to help them succeed in postsecondary education.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Victory Program
Triple: [United States home front during World War II, keyProgram, Victory Program]
Generated description
The Victory Program was a comprehensive U.S. military mobilization and production plan developed before America’s entry into World War II to prepare the nation for large-scale global conflict.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Victory Program
Target entity description: The Victory Program was a comprehensive U.S. military mobilization and production plan developed before America’s entry into World War II to prepare the nation for large-scale global conflict.
  • A. Vanguard program
    The Vanguard program was an early U.S. Navy–run satellite project during the Cold War that aimed to launch some of the first American satellites into Earth orbit as part of the International Geophysical Year.
  • B. Phoenix Program
    The Phoenix Program was a controversial covert counterinsurgency and intelligence operation run by the United States and South Vietnamese governments during the Vietnam War, aimed at identifying, capturing, or eliminating Viet Cong infrastructure.
  • C. Victory
    Victory is a public transit station code used within the Dallas Area Rapid Transit (DART) system, identifying Victory Station in Dallas, Texas.
  • D. The Transitional Program
    The Transitional Program is Leon Trotsky’s 1938 manifesto for the Fourth International, outlining a strategy of transitional demands intended to bridge workers’ immediate struggles with the goal of socialist revolution.
  • E. Upward Bound
    Upward Bound is a U.S. federal TRIO program that provides academic support and college preparation services to low-income and first-generation high school students to help them succeed in postsecondary education.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: keyProgram
Context triple: [United States home front during World War II, keyProgram, Victory Program]
  • A. key
    Indicates that one entity functions as a key (literal or metaphorical) that unlocks, enables access to, or provides a crucial solution or control over another entity.
  • B. keyComponent
    Indicates that one entity is an essential or foundational part required for the proper function, structure, or identity of another entity.
  • C. keySymbol
    Indicates that one entity serves as the symbolic representation or notation used to denote another entity as a key.
  • D. keyTarget
    Indicates that one entity serves as the primary focus, objective, or intended recipient of another entity’s action, function, or influence.
  • E. keyRite
    Indicates that an entity performs or is associated with a ritual, ceremony, or formal procedure involving a key (literal or symbolic).
  • F. None of above. chosen

Provenance (7 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885e9b0ac819093a9806ad0efc82c completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69a93d4756888190bf3872154de11539 completed March 5, 2026, 8:22 a.m.
NED1 Entity disambiguation (via context triple) batch_69ad294d01c48190bb2f49ad4f1b0a1a completed March 8, 2026, 7:46 a.m.
NEDg Description generation batch_69ad2a275938819090db4d9ac7274a4d completed March 8, 2026, 7:49 a.m.
NED2 Entity disambiguation (via description) batch_69ad2a9e50888190bab83785f11135ea completed March 8, 2026, 7:51 a.m.
PD Predicate disambiguation batch_69a907ac7ea081908dd95bb5cc3b9847 completed March 5, 2026, 4:33 a.m.
PDg Predicate description generation batch_69a93d462f208190b27ef5cd631bce12 completed March 5, 2026, 8:22 a.m.
Created at: March 4, 2026, 7:26 p.m.