Triple

T15189471
Position Surface form Disambiguated ID Type / Status
Subject Switch Island E362965 entity
Predicate upgradeImplemented P23568 FINISHED
Object signalisation improvements LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: signalisation improvements | Statement: [Switch Island, upgradeImplemented, signalisation improvements]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: upgradeImplemented
Context triple: [Switch Island, upgradeImplemented, signalisation improvements]
  • A. upgradeMethod
    Indicates the method or process by which something is improved, updated, or elevated to a higher level or version.
  • B. upgradeType chosen
    Indicates the specific kind or category of improvement or enhancement applied to an entity relative to its previous state.
  • C. upgradePath
    Indicates the relationship by which one entity can be improved, enhanced, or transitioned into another, typically more advanced, version or state.
  • D. upgradeGoal
    Indicates that an entity has a target or intended improvement to a higher level, version, or state relative to its current condition.
  • E. upgradeProgram
    Indicates that one entity improves, enhances, or replaces another entity’s program with a more advanced or updated version.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a09a39c81908759f23268e2d408 completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e0067beedc8190abc0a94c7a38f85e completed April 15, 2026, 9:43 p.m.
PD Predicate disambiguation batch_69deb97bd8bc8190b2ad4888f97cf963 completed April 14, 2026, 10:02 p.m.
Created at: April 10, 2026, 3:10 a.m.