Triple
T15156522
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Amey |
E362094
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure services company |
C2979
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure services company Context triple: [Amey, instanceOf, infrastructure services company]
-
A.
infrastructure management company
chosen
An infrastructure management company plans, operates, maintains, and optimizes physical assets and systems—such as transportation, utilities, and public works—to ensure their reliability, efficiency, and long-term performance.
-
B.
energy infrastructure company
An energy infrastructure company develops, owns, and operates the physical assets and networks that produce, transport, store, and deliver energy resources and power to end users.
-
C.
infrastructure finance company
An infrastructure finance company is a financial institution that provides long-term funding, credit support, and advisory services for the development, operation, and maintenance of large-scale public and private infrastructure projects.
-
D.
oil and gas services company
An oil and gas services company provides specialized technical, operational, and logistical support to exploration and production firms across the hydrocarbon value chain.
-
E.
transportation services company
A transportation services company is an organization that plans, manages, and operates the movement of people or goods using various modes of transport, such as road, rail, air, or sea, often providing logistics, scheduling, and support services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a0759908190b8a051d2e2a1cbe6 |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:08 a.m.