Triple

T15135383
Position Surface form Disambiguated ID Type / Status
Subject Internet in Nepal E361539 entity
Predicate infrastructureIssues P54339 FINISHED
Object frequent power outages LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: frequent power outages | Statement: [Internet in Nepal, infrastructureIssues, frequent power outages]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: infrastructureIssues
Context triple: [Internet in Nepal, infrastructureIssues, frequent power outages]
  • A. infrastructureNeed
    Indicates that an entity requires the development, improvement, or provision of infrastructure to meet its functional or operational needs.
  • B. infrastructureImpact chosen
    Indicates the effect that an action, event, or entity has on the condition, performance, or availability of infrastructure systems.
  • C. infrastructureFocusArea
    Indicates the specific aspect or domain of infrastructure that an entity, project, or activity is primarily concerned with or directed toward.
  • D. proposedInfrastructure
    Indicates that an infrastructure project or facility has been suggested or planned but not yet approved, built, or implemented between the related entities.
  • E. infrastructureProjects
    Indicates that there are planned, ongoing, or completed construction or development works related to physical or organizational infrastructure involving the associated entities.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a06450081909c5a14ea9851a15e completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e005b3f6f48190b1ed7c7b28feb7a6 completed April 15, 2026, 9:40 p.m.
PD Predicate disambiguation batch_69deb9713fe881909dec2fd3f6c84b39 completed April 14, 2026, 10:02 p.m.
Created at: April 10, 2026, 3:07 a.m.