Triple
T15131231
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Borssele nuclear power plant |
E361423
|
entity |
| Predicate | connectedTo |
P37
|
FINISHED |
| Object |
European interconnected power system
The European interconnected power system is a large, synchronized electricity grid that links the national power networks of many European countries to enable reliable, cross-border power exchange and system stability.
|
E1139130
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: European interconnected power system | Statement: [Borssele nuclear power plant, connectedTo, European interconnected power system]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: European interconnected power system Context triple: [Borssele nuclear power plant, connectedTo, European interconnected power system]
-
A.
Baltic power grid
The Baltic power grid is the interconnected electricity transmission network serving the Baltic states of Estonia, Latvia, and Lithuania, linking their power systems with neighboring regions.
-
B.
North American power transmission grid
The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
-
C.
Dutch national power grid
The Dutch national power grid is the nationwide high-voltage electricity transmission network in the Netherlands that distributes power from generation sites to regional and local grids.
-
D.
Unified Energy System of Russia
The Unified Energy System of Russia is the nationwide interconnected power grid and electricity market that coordinates generation, transmission, and distribution across the Russian Federation.
-
E.
Energy Union
The Energy Union is a European Union initiative aimed at ensuring secure, sustainable, competitive, and affordable energy across member states through integrated energy markets and coordinated climate and energy policies.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: European interconnected power system Triple: [Borssele nuclear power plant, connectedTo, European interconnected power system]
Generated description
The European interconnected power system is a large, synchronized electricity grid that links the national power networks of many European countries to enable reliable, cross-border power exchange and system stability.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: European interconnected power system Target entity description: The European interconnected power system is a large, synchronized electricity grid that links the national power networks of many European countries to enable reliable, cross-border power exchange and system stability.
-
A.
Baltic power grid
The Baltic power grid is the interconnected electricity transmission network serving the Baltic states of Estonia, Latvia, and Lithuania, linking their power systems with neighboring regions.
-
B.
North American power transmission grid
The North American power transmission grid is the vast, interconnected high-voltage network that delivers electricity across the United States, Canada, and parts of Mexico through several major synchronized interconnections.
-
C.
Dutch national power grid
The Dutch national power grid is the nationwide high-voltage electricity transmission network in the Netherlands that distributes power from generation sites to regional and local grids.
-
D.
Unified Energy System of Russia
The Unified Energy System of Russia is the nationwide interconnected power grid and electricity market that coordinates generation, transmission, and distribution across the Russian Federation.
-
E.
Energy Union
The Energy Union is a European Union initiative aimed at ensuring secure, sustainable, competitive, and affordable energy across member states through integrated energy markets and coordinated climate and energy policies.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a06450081909c5a14ea9851a15e |
completed | April 10, 2026, 2:01 a.m. |
| NER | Named-entity recognition | batch_69e005b194748190801e3956bf2429d4 |
completed | April 15, 2026, 9:40 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69feb7fa449c8190aed8941168b063c3 |
completed | May 9, 2026, 4:28 a.m. |
| NEDg | Description generation | batch_69febbfb58608190830eca7f9a78fc9c |
completed | May 9, 2026, 4:45 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69febc842a7081908a85ba2833212650 |
completed | May 9, 2026, 4:48 a.m. |
Created at: April 10, 2026, 3:06 a.m.