Triple

T15131205
Position Surface form Disambiguated ID Type / Status
Subject Borssele nuclear power plant E361423 entity
Predicate plannedShutdownYear P117437 FINISHED
Object 2033 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2033 | Statement: [Borssele nuclear power plant, plannedShutdownYear, 2033]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedShutdownYear
Context triple: [Borssele nuclear power plant, plannedShutdownYear, 2033]
  • A. decommissioningEndDate
    Indicates the date on which a decommissioning process or status for something is completed or officially ends.
  • B. decommissioningStartDate
    Indicates the date on which the process of taking an asset or system out of active service is initiated.
  • C. planningYear
    Indicates the year in which planning or preparation activities for something are scheduled or designated to occur.
  • D. exitYear
    Indicates the year in which an entity leaves, finishes, or ceases its association with another entity or context.
  • E. originalPlannedOpeningYear
    Indicates the year that was initially scheduled or intended for something to open, before any delays or changes.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a06450081909c5a14ea9851a15e completed April 10, 2026, 2:01 a.m.
NER Named-entity recognition batch_69e005b194748190801e3956bf2429d4 completed April 15, 2026, 9:40 p.m.
PD Predicate disambiguation batch_69deb9713fe881909dec2fd3f6c84b39 completed April 14, 2026, 10:02 p.m.
PDg Predicate description generation batch_69dec71e8dcc81908badc834b6ccf273 completed April 14, 2026, 11 p.m.
Created at: April 10, 2026, 3:06 a.m.