Triple
T15130695
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | steam engine house (Maschinenhaus) |
E361410
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | steam engine house |
C7851
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: steam engine house Context triple: [steam engine house (Maschinenhaus), instanceOf, steam engine house]
-
A.
steam-powered railway
A steam-powered railway is a transportation system in which trains are propelled along tracks by locomotives that generate mechanical power from steam produced by boiling water, typically using coal or other fuels.
-
B.
steam-powered mill
A steam-powered mill is an industrial facility that uses steam engines to drive machinery for grinding grain or processing raw materials, enabling continuous, high-capacity production independent of wind or water power.
-
C.
steam pumping station
chosen
A steam pumping station is an industrial facility that uses steam-powered engines to drive pumps for moving water or other fluids, typically for municipal water supply, drainage, or industrial processes.
-
D.
steam-generating boiler
A steam-generating boiler is an enclosed vessel in which water is heated—typically by burning fuel or using other heat sources—to produce pressurized steam for power generation, heating, or industrial processes.
-
E.
locomotive works
A locomotive works is an industrial facility where locomotives are designed, manufactured, assembled, repaired, and maintained.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85a06450081909c5a14ea9851a15e |
completed | April 10, 2026, 2:01 a.m. |
Created at: April 10, 2026, 3:06 a.m.