Triple

T1511894
Position Surface form Disambiguated ID Type / Status
Subject North Lanarkshire E32030 entity
Predicate traversedBy P225 FINISHED
Object A80 road E332252 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: A80 road | Statement: [North Lanarkshire, traversedBy, A80 road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: A80 road
Context triple: [North Lanarkshire, traversedBy, A80 road]
  • A. A80 road chosen
    The A80 road is a major route in Scotland that historically connected Glasgow to Stirling and the north before being largely replaced by the M80 motorway.
  • B. A8 road
    The A8 road is a major route in the United Kingdom that connects Glasgow to Greenock in western Scotland, serving as an important link for regional and local traffic.
  • C. A82 road
    The A82 road is a major Scottish trunk route running from Glasgow to Inverness through the Highlands, including the scenic western shore of Loch Lomond.
  • D. A81 road
    The A81 road is a major route in central Scotland that runs between Glasgow and Callander, passing through towns and villages such as Aberfoyle and providing access to the Trossachs area.
  • E. A85 road
    The A85 road is a major trunk route in Scotland that runs through Perth and western regions, connecting several towns and linking with key motorways.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a885e8caf88190a5fbb6159ce87786 completed March 4, 2026, 7:20 p.m.
NER Named-entity recognition batch_69aa61db41c88190a2d97cc9cbbc3f06 completed March 6, 2026, 5:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69b67b92d4dc81908a26a977bc25319c completed March 15, 2026, 9:27 a.m.
Created at: March 4, 2026, 7:26 p.m.