Triple

T15085648
Position Surface form Disambiguated ID Type / Status
Subject Μασσαλία E360265 entity
Predicate instanceOf P0 FINISHED
Object λιμάνι C452 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: λιμάνι
Context triple: [Μασσαλία, instanceOf, λιμάνι]
  • A. marina
    A marina is a specialized harbor facility that provides moorings, services, and amenities for recreational and small commercial boats and yachts.
  • B. seaport chosen
    A seaport is a coastal facility equipped with harbors, docks, and infrastructure to enable the loading, unloading, storage, and transfer of cargo and passengers between sea and land transportation.
  • C. port crane
    A port crane is a large, fixed or mobile lifting machine used at harbors and container terminals to load, unload, and move cargo between ships and the shore.
  • D. maritime passage
    A maritime passage is a navigable sea route or waterway that connects larger bodies of water, enabling the movement of ships and maritime traffic between regions.
  • E. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85a035aa88190b52a139d3a1b7b6d completed April 10, 2026, 2:01 a.m.
Created at: April 10, 2026, 3:03 a.m.