Triple

T15071252
Position Surface form Disambiguated ID Type / Status
Subject Terminal 1 (Toronto Pearson International Airport) E379882 entity
Predicate hasParkingStructure P28595 FINISHED
Object Terminal 1 Parking Garage
Terminal 1 Parking Garage is a multi-level parking facility serving passengers and visitors using Terminal 1 at Toronto Pearson International Airport.
E1134733 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Terminal 1 Parking Garage | Statement: [Terminal 1 (Toronto Pearson International Airport), hasParkingStructure, Terminal 1 Parking Garage]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Terminal 1 Parking Garage
Context triple: [Terminal 1 (Toronto Pearson International Airport), hasParkingStructure, Terminal 1 Parking Garage]
  • A. Forest Glen Plaza terminal
    Forest Glen Plaza terminal is a major public transit hub in Kitchener, Ontario, serving as a key bus transfer point within the Grand River Transit network.
  • B. Terminal 2 complex
    Terminal 2 complex is a major multi-terminal passenger facility at Paris Charles de Gaulle Airport that groups several interconnected sub-terminals and services.
  • C. Terminal 2 complex
    Terminal 2 complex is the main passenger terminal area at Budapest Ferenc Liszt International Airport, handling the majority of the airport’s commercial flights and services.
  • D. Terminal A-West
    Terminal A-West is an international terminal at Philadelphia International Airport primarily serving transatlantic and other long-haul international flights.
  • E. Main Terminal Building
    The Main Terminal Building is the primary passenger terminal complex at Kuala Lumpur International Airport, housing check-in, immigration, baggage, and key passenger services.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Terminal 1 Parking Garage
Triple: [Terminal 1 (Toronto Pearson International Airport), hasParkingStructure, Terminal 1 Parking Garage]
Generated description
Terminal 1 Parking Garage is a multi-level parking facility serving passengers and visitors using Terminal 1 at Toronto Pearson International Airport.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Terminal 1 Parking Garage
Target entity description: Terminal 1 Parking Garage is a multi-level parking facility serving passengers and visitors using Terminal 1 at Toronto Pearson International Airport.
  • A. Forest Glen Plaza terminal
    Forest Glen Plaza terminal is a major public transit hub in Kitchener, Ontario, serving as a key bus transfer point within the Grand River Transit network.
  • B. Terminal 2 complex
    Terminal 2 complex is a major multi-terminal passenger facility at Paris Charles de Gaulle Airport that groups several interconnected sub-terminals and services.
  • C. Terminal 2 complex
    Terminal 2 complex is the main passenger terminal area at Budapest Ferenc Liszt International Airport, handling the majority of the airport’s commercial flights and services.
  • D. Terminal A-West
    Terminal A-West is an international terminal at Philadelphia International Airport primarily serving transatlantic and other long-haul international flights.
  • E. Main Terminal Building
    The Main Terminal Building is the primary passenger terminal complex at Kuala Lumpur International Airport, housing check-in, immigration, baggage, and key passenger services.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasParkingStructure
Context triple: [Terminal 1 (Toronto Pearson International Airport), hasParkingStructure, Terminal 1 Parking Garage]
  • A. hasParking
    Indicates that a place or facility provides designated parking space(s) available for use.
  • B. parkingStructure chosen
    Indicates that one entity is a parking facility or structure associated with another entity (such as a building, location, or organization).
  • C. hasParkingFor
    Indicates that a place or facility provides designated parking spaces suitable for a specified type of vehicle or user.
  • D. hasUndergroundParking
    Indicates that a place or building provides parking facilities located below ground level.
  • E. hasParkingNearby
    Indicates that a location has one or more parking facilities or spaces available within a close surrounding area.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd7683881908d405c1b5d7b4f7f completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69dff7f86df48190b3a2cf441fefb477 completed April 15, 2026, 8:41 p.m.
NED1 Entity disambiguation (via context triple) batch_69fea5cff69c8190b6252509c1aa7ebb completed May 9, 2026, 3:11 a.m.
NEDg Description generation batch_69fea6bf2558819082fc91fe8df6f3f5 completed May 9, 2026, 3:15 a.m.
NED2 Entity disambiguation (via description) batch_69fea8018a088190b6eba72a7e6196b2 completed May 9, 2026, 3:20 a.m.
PD Predicate disambiguation batch_69deb95a182081908fffc4402b02a394 completed April 14, 2026, 10:02 p.m.
Created at: April 10, 2026, 3:02 a.m.