Triple

T15049217
Position Surface form Disambiguated ID Type / Status
Subject Golden Gate Bridge corridor E379309 entity
Predicate instanceOf P0 FINISHED
Object bicycle transportation corridor C2952 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bicycle transportation corridor
Context triple: [Golden Gate Bridge corridor, instanceOf, bicycle transportation corridor]
  • A. road transportation corridor
    A road transportation corridor is a designated linear area of land that accommodates one or more roadways and associated infrastructure to enable the efficient movement of vehicles, goods, and people between key origins and destinations.
  • B. transport corridor chosen
    A transport corridor is a designated route or geographic band that concentrates and connects major transportation infrastructure—such as roads, railways, ports, and logistics hubs—to facilitate efficient movement of people and goods between key locations.
  • C. rail trail
    A rail trail is a multi-use path created from a disused railway corridor, typically used for walking, cycling, and other non-motorized recreation and transportation.
  • D. national cycling infrastructure
    National cycling infrastructure is the integrated network of bike paths, lanes, facilities, and supporting policies designed at a country-wide level to enable safe, efficient, and accessible cycling for transportation and recreation.
  • E. planned transit corridor
    A planned transit corridor is a designated route or area reserved for future development of public transportation infrastructure, such as bus rapid transit or rail lines, to guide growth and improve regional mobility.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd64d108190853797a95c11cc45 completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 3 a.m.