Triple

T15048531
Position Surface form Disambiguated ID Type / Status
Subject M1 (New South Wales) E379292 entity
Predicate partOf P40 FINISHED
Object Sydney–Brisbane coastal corridor via connecting motorways
The Sydney–Brisbane coastal corridor via connecting motorways is a major intercity road route linking Sydney and Brisbane along Australia’s east coast, carrying significant passenger and freight traffic between New South Wales and Queensland.
E1134030 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Sydney–Brisbane coastal corridor via connecting motorways | Statement: [M1 (New South Wales), partOf, Sydney–Brisbane coastal corridor via connecting motorways]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Sydney–Brisbane coastal corridor via connecting motorways
Context triple: [M1 (New South Wales), partOf, Sydney–Brisbane coastal corridor via connecting motorways]
  • A. Brisbane–Gold Coast transport corridor
    The Brisbane–Gold Coast transport corridor is a major urban and intercity transport axis in South East Queensland, Australia, linking Brisbane with the Gold Coast via road and rail infrastructure.
  • B. Sydney–Albury coach corridor
    The Sydney–Albury coach corridor is a long-distance regional bus route in New South Wales, Australia, linking Sydney with the inland city of Albury as part of the state’s public transport network.
  • C. Sydney–Port Macquarie coach corridor
    The Sydney–Port Macquarie coach corridor is a long-distance passenger coach route in New South Wales, Australia, linking Sydney with the coastal city of Port Macquarie as part of the regional public transport network.
  • D. Sydney–Canberra coach corridor
    The Sydney–Canberra coach corridor is a major intercity bus route linking Australia’s largest city with the national capital, serving as a key public transport connection between New South Wales and the Australian Capital Territory.
  • E. Central Coast–Hunter corridor
    The Central Coast–Hunter corridor is a major regional growth and transport corridor in New South Wales, Australia, linking the Central Coast with the Hunter region and encompassing a chain of urban and peri-urban communities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Sydney–Brisbane coastal corridor via connecting motorways
Triple: [M1 (New South Wales), partOf, Sydney–Brisbane coastal corridor via connecting motorways]
Generated description
The Sydney–Brisbane coastal corridor via connecting motorways is a major intercity road route linking Sydney and Brisbane along Australia’s east coast, carrying significant passenger and freight traffic between New South Wales and Queensland.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Sydney–Brisbane coastal corridor via connecting motorways
Target entity description: The Sydney–Brisbane coastal corridor via connecting motorways is a major intercity road route linking Sydney and Brisbane along Australia’s east coast, carrying significant passenger and freight traffic between New South Wales and Queensland.
  • A. Brisbane–Gold Coast transport corridor
    The Brisbane–Gold Coast transport corridor is a major urban and intercity transport axis in South East Queensland, Australia, linking Brisbane with the Gold Coast via road and rail infrastructure.
  • B. Sydney–Albury coach corridor
    The Sydney–Albury coach corridor is a long-distance regional bus route in New South Wales, Australia, linking Sydney with the inland city of Albury as part of the state’s public transport network.
  • C. Sydney–Port Macquarie coach corridor
    The Sydney–Port Macquarie coach corridor is a long-distance passenger coach route in New South Wales, Australia, linking Sydney with the coastal city of Port Macquarie as part of the regional public transport network.
  • D. Sydney–Canberra coach corridor
    The Sydney–Canberra coach corridor is a major intercity bus route linking Australia’s largest city with the national capital, serving as a key public transport connection between New South Wales and the Australian Capital Territory.
  • E. Central Coast–Hunter corridor
    The Central Coast–Hunter corridor is a major regional growth and transport corridor in New South Wales, Australia, linking the Central Coast with the Hunter region and encompassing a chain of urban and peri-urban communities.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd64d108190853797a95c11cc45 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69deda8e64e48190873104a02a676ff3 completed April 15, 2026, 12:23 a.m.
NED1 Entity disambiguation (via context triple) batch_69fe9de83b648190ba437c0fac164ec6 completed May 9, 2026, 2:37 a.m.
NEDg Description generation batch_69fe9e6ec16081909cc55fd11bc89eb4 completed May 9, 2026, 2:39 a.m.
NED2 Entity disambiguation (via description) batch_69fe9eedca1481908ce438991184d62e completed May 9, 2026, 2:41 a.m.
Created at: April 10, 2026, 3 a.m.