Triple

T15042508
Position Surface form Disambiguated ID Type / Status
Subject Stord E378635 entity
Predicate hasTunnelConnection P8776 FINISHED
Object Bømla Tunnel E380397 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Bømla Tunnel | Statement: [Stord, hasTunnelConnection, Bømla Tunnel]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Bømla Tunnel
Context triple: [Stord, hasTunnelConnection, Bømla Tunnel]
  • A. Bømlafjord Tunnel chosen
    Bømlafjord Tunnel is a subsea road tunnel in Vestland county, Norway, forming part of the fixed link connection between the island municipality of Bømlo and the mainland.
  • B. Tromsøysund Tunnel
    Tromsøysund Tunnel is an undersea road tunnel in northern Norway that connects the island city of Tromsø to the mainland.
  • C. Byfjord Tunnel
    The Byfjord Tunnel is an undersea road tunnel in Rogaland county, Norway, forming part of the main highway connection between the city of Stavanger and the island municipality of Rennesøy.
  • D. Lærdal Tunnel
    The Lærdal Tunnel is a 24.5-kilometer road tunnel in Norway, renowned as one of the world's longest road tunnels and a key link between Oslo and Bergen.
  • E. Honningsvåg Tunnel
    Honningsvåg Tunnel is a road tunnel in northern Norway that carries traffic along the E69 highway toward the North Cape.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd46b2c819090d054c27787f677 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69ded82f73208190bb55fa6b20074e27 completed April 15, 2026, 12:13 a.m.
NED1 Entity disambiguation (via context triple) batch_69fe9de388508190bb0ecc04740cbe15 completed May 9, 2026, 2:37 a.m.
Created at: April 10, 2026, 3 a.m.