Triple
T15036703
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | All Aboard Florida project |
E378494
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | intercity passenger rail project |
C34688
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: intercity passenger rail project Context triple: [All Aboard Florida project, instanceOf, intercity passenger rail project]
-
A.
passenger rail service
Passenger rail service is a transportation system that operates trains to carry people between locations on a scheduled basis, typically offering various classes of comfort and amenities.
-
B.
Amtrak program
An Amtrak program is an organized set of services, policies, and initiatives designed to manage and enhance passenger rail operations, customer experience, and related business objectives within the Amtrak system.
-
C.
commuter rail infrastructure
Commuter rail infrastructure comprises the physical and operational systems—such as tracks, stations, signaling, power, and maintenance facilities—designed to support frequent, reliable passenger train service between suburbs and urban centers.
-
D.
commuter rail line
A commuter rail line is a passenger train service that operates on fixed tracks and schedules to connect suburban or outlying areas with a central city, primarily serving daily work and school commuters.
-
E.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85cd46b2c819090d054c27787f677 |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 2:59 a.m.