Triple

T15027130
Position Surface form Disambiguated ID Type / Status
Subject Celilo Falls E378246 entity
Predicate locatedNear P294 FINISHED
Object Dalles Dam E76914 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Dalles Dam | Statement: [Celilo Falls, locatedNear, Dalles Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Dalles Dam
Context triple: [Celilo Falls, locatedNear, Dalles Dam]
  • A. The Dalles Dam chosen
    The Dalles Dam is a large hydroelectric dam and navigation facility on the Columbia River in the Pacific Northwest, known for its significant power generation and impact on regional river ecosystems and communities.
  • B. Skookumchuck Dam
    Skookumchuck Dam is a hydroelectric and flood-control structure built on the Skookumchuck River in Washington State.
  • C. Dworshak Dam
    Dworshak Dam is a large concrete gravity dam on the North Fork Clearwater River in Idaho, primarily used for hydroelectric power generation, flood control, and recreation.
  • D. Minidoka Dam
    Minidoka Dam is an early 20th-century Bureau of Reclamation irrigation and hydroelectric dam on the Snake River in southern Idaho.
  • E. O'Shaughnessy Dam
    O'Shaughnessy Dam is a concrete arch-gravity dam in Yosemite National Park that creates the Hetch Hetchy Reservoir, supplying water and hydroelectric power to the San Francisco Bay Area.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd46b2c819090d054c27787f677 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69ded7dfcb508190aec8cd667e27a8ea completed April 15, 2026, 12:12 a.m.
NED1 Entity disambiguation (via context triple) batch_6a01232149f88190b385fca6a7588d7b completed May 11, 2026, 12:30 a.m.
Created at: April 10, 2026, 2:58 a.m.