Triple

T15016104
Position Surface form Disambiguated ID Type / Status
Subject W76 thermonuclear warhead E377962 entity
Predicate storageAndAssemblySite P59462 FINISHED
Object Pantex Plant E112612 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Pantex Plant | Statement: [W76 thermonuclear warhead, storageAndAssemblySite, Pantex Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Pantex Plant
Context triple: [W76 thermonuclear warhead, storageAndAssemblySite, Pantex Plant]
  • A. Pantex Plant chosen
    Pantex Plant is a U.S. nuclear weapons facility in Texas responsible for the assembly, disassembly, and maintenance of the nation’s nuclear warheads.
  • B. Y-12 National Security Complex
    The Y-12 National Security Complex is a U.S. Department of Energy facility central to nuclear weapons production, uranium processing, and national security operations.
  • C. Richland Operations Office
    The Richland Operations Office is a U.S. Department of Energy field office responsible for overseeing environmental cleanup and related activities at the Hanford Site in Washington State.
  • D. Kerr-McGee Cimarron Fuel Fabrication Site
    The Kerr-McGee Cimarron Fuel Fabrication Site was a nuclear fuel production facility in Oklahoma best known for its association with whistleblower Karen Silkwood and the ensuing controversies over worker safety and plutonium contamination.
  • E. Oak Ridge Gaseous Diffusion Plant
    The Oak Ridge Gaseous Diffusion Plant was a major U.S. uranium enrichment facility in Oak Ridge, Tennessee, built during the Manhattan Project and later used for Cold War nuclear fuel production.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: storageAndAssemblySite
Context triple: [W76 thermonuclear warhead, storageAndAssemblySite, Pantex Plant]
  • A. storageFacility
    Indicates a relationship where one entity serves as a place or facility used to store another entity or its items.
  • B. canBeStoredOn
    Indicates that one entity is capable of being placed, kept, or maintained on another entity as a storage location.
  • C. locationOfAssembly chosen
    Indicates the place where a group, object, or structure is put together, constructed, or assembled.
  • D. storageOrgan
    Indicates that one entity serves as a storage organ (a specialized structure for storing substances like nutrients or water) for another entity.
  • E. storesInterfaceIn
    Indicates that one entity keeps or maintains an interface definition within another entity (such as a container, module, or storage location).
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd3a3c881908c71fc424d459c17 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69ded7633fcc8190b2231f43252bc46f completed April 15, 2026, 12:10 a.m.
NED1 Entity disambiguation (via context triple) batch_69fe96ae110c8190a0555590b9ddb36a completed May 9, 2026, 2:06 a.m.
PD Predicate disambiguation batch_69de9a6531a88190acde65199a477350 completed April 14, 2026, 7:49 p.m.
Created at: April 10, 2026, 2:55 a.m.