Triple

T15005638
Position Surface form Disambiguated ID Type / Status
Subject Emerald, Queensland E377704 entity
Predicate hasDamNearby P39585 FINISHED
Object Fairbairn Dam
Fairbairn Dam is a major water storage and irrigation dam in Central Queensland, Australia, primarily serving agricultural and regional water needs near the town of Emerald.
E1239039 NE FINISHED

How this triple was built (5 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Fairbairn Dam | Statement: [Emerald, Queensland, hasDamNearby, Fairbairn Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Fairbairn Dam
Context triple: [Emerald, Queensland, hasDamNearby, Fairbairn Dam]
  • A. Tulloch Dam
    Tulloch Dam is a concrete gravity dam on the Stanislaus River in California that forms Tulloch Reservoir for irrigation, hydroelectric power generation, and recreation.
  • B. O’Sullivan Dam
    O’Sullivan Dam is a major earth-fill dam in central Washington State that forms Potholes Reservoir and plays a key role in irrigation and water management for the Columbia Basin Project.
  • C. Brownlee Dam
    Brownlee Dam is a major hydroelectric dam on the Snake River in the western United States, forming Brownlee Reservoir and playing a key role in regional power generation and water management.
  • D. Bluestone Dam
    Bluestone Dam is a large concrete gravity dam on the New River in West Virginia, primarily used for flood control, recreation, and hydroelectric power generation.
  • E. Hinze Dam
    Hinze Dam is a major rock and earth-fill dam on the Gold Coast in Queensland, Australia, that creates Advancetown Lake and supplies water, flood mitigation, and recreation for the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Fairbairn Dam
Triple: [Emerald, Queensland, hasDamNearby, Fairbairn Dam]
Generated description
Fairbairn Dam is a major water storage and irrigation dam in Central Queensland, Australia, primarily serving agricultural and regional water needs near the town of Emerald.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Fairbairn Dam
Target entity description: Fairbairn Dam is a major water storage and irrigation dam in Central Queensland, Australia, primarily serving agricultural and regional water needs near the town of Emerald.
  • A. Tulloch Dam
    Tulloch Dam is a concrete gravity dam on the Stanislaus River in California that forms Tulloch Reservoir for irrigation, hydroelectric power generation, and recreation.
  • B. O’Sullivan Dam
    O’Sullivan Dam is a major earth-fill dam in central Washington State that forms Potholes Reservoir and plays a key role in irrigation and water management for the Columbia Basin Project.
  • C. Brownlee Dam
    Brownlee Dam is a major hydroelectric dam on the Snake River in the western United States, forming Brownlee Reservoir and playing a key role in regional power generation and water management.
  • D. Bluestone Dam
    Bluestone Dam is a large concrete gravity dam on the New River in West Virginia, primarily used for flood control, recreation, and hydroelectric power generation.
  • E. Hinze Dam
    Hinze Dam is a major rock and earth-fill dam on the Gold Coast in Queensland, Australia, that creates Advancetown Lake and supplies water, flood mitigation, and recreation for the region.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasDamNearby
Context triple: [Emerald, Queensland, hasDamNearby, Fairbairn Dam]
  • A. hasDam
    Indicates that a watercourse, reservoir, or similar feature is impounded or controlled by a specific dam.
  • B. hasNearbyFell
    Indicates that one entity has a fell (a hill or high moorland area) located in close proximity to it.
  • C. hasNotableNearbyEntity chosen
    Indicates that one entity has another significant or noteworthy entity located in its close physical or contextual proximity.
  • D. hasNearbySourceOf
    Indicates that one entity is located close enough to another entity to serve as a relevant or accessible source of it.
  • E. hasNearbyMine
    Indicates that one entity is located close to or in the vicinity of a mine associated with another entity.
  • F. None of above.

Provenance (6 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cd3a3c881908c71fc424d459c17 completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69ded7322b5c81909089cbbf816e1436 completed April 15, 2026, 12:09 a.m.
NED1 Entity disambiguation (via context triple) batch_6a00c28d1e1c81909e869f01659ec233 completed May 10, 2026, 5:38 p.m.
NEDg Description generation batch_6a00c457a1608190bd57155e91e55e9c completed May 10, 2026, 5:45 p.m.
NED2 Entity disambiguation (via description) batch_6a00c5230fd481908cbc37e332b72380 completed May 10, 2026, 5:49 p.m.
PD Predicate disambiguation batch_69de9a6531a88190acde65199a477350 completed April 14, 2026, 7:49 p.m.
Created at: April 10, 2026, 2:54 a.m.