Triple
T14994179
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Saarinen, Swanson & Saarinen |
E373912
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | modernist architectural firm |
C5103
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: modernist architectural firm Context triple: [Saarinen, Swanson & Saarinen, instanceOf, modernist architectural firm]
-
A.
modernist architecture firm
chosen
A modernist architecture firm is a design-focused company that creates functional, minimalist buildings emphasizing clean lines, open spaces, and innovative use of modern materials and technology.
-
B.
architecture and design firm
A professional company that plans, designs, and often oversees the construction of buildings and interior spaces, integrating aesthetics, functionality, and client needs.
-
C.
Beaux-Arts architectural firm
A Beaux-Arts architectural firm is a design practice that creates grand, formally composed buildings characterized by classical symmetry, rich ornamentation, and academic planning principles rooted in the École des Beaux-Arts tradition.
-
D.
modernist architectural work
A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
-
E.
urban design firm
An urban design firm is a professional organization that plans, designs, and coordinates the development of urban spaces, integrating architecture, landscape, transportation, and community needs to create functional and livable environments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85ccc84388190aa151e5173370c8d |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 2:53 a.m.