Triple

T14991616
Position Surface form Disambiguated ID Type / Status
Subject Birch services E373847 entity
Predicate locatedOn P40 FINISHED
Object M60 motorway E12161 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: M60 motorway | Statement: [Birch services, locatedOn, M60 motorway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: M60 motorway
Context triple: [Birch services, locatedOn, M60 motorway]
  • A. M60 motorway chosen
    The M60 motorway is an orbital motorway encircling the city of Manchester, forming a key part of the road network in Greater Manchester, England.
  • B. M58 motorway
    The M58 motorway is a key road in North West England that links the M6 near Wigan to the Liverpool area, providing an important route across Merseyside and Lancashire.
  • C. M65 motorway
    The M65 motorway is a key road in Lancashire, England, linking Preston with towns across East Lancashire and connecting to the wider UK motorway network.
  • D. M602 motorway
    The M602 motorway is a short urban motorway in Greater Manchester, England, linking the M60 and M62 to central Salford and providing a key route into Manchester from the west.
  • E. M-2 Motorway
    The M-2 Motorway is a major Pakistani expressway that links the cities of Islamabad and Lahore, serving as a key part of the country’s north–south transportation corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85ccc84388190aa151e5173370c8d completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69ded715db408190b44e8a8452c79764 completed April 15, 2026, 12:08 a.m.
NED1 Entity disambiguation (via context triple) batch_6a00679214208190a9ee4cce882f59cb completed May 10, 2026, 11:10 a.m.
Created at: April 10, 2026, 2:53 a.m.