Triple
T14991370
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Sanford Underground Research Facility |
E373841
|
entity |
| Predicate | hostsExperiment |
P1591
|
FINISHED |
| Object |
CASPAR accelerator experiment
The CASPAR accelerator experiment is a low-energy nuclear astrophysics project designed to study stellar fusion reactions by accelerating particles in a deep underground laboratory environment.
|
E1132330
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: CASPAR accelerator experiment | Statement: [Sanford Underground Research Facility, hostsExperiment, CASPAR accelerator experiment]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: CASPAR accelerator experiment Context triple: [Sanford Underground Research Facility, hostsExperiment, CASPAR accelerator experiment]
-
A.
Continuous Electron Beam Accelerator Facility
The Continuous Electron Beam Accelerator Facility is a high-energy physics research installation that provides continuous beams of electrons for probing the structure of nuclear matter.
-
B.
Accelerator Test Facility
The Accelerator Test Facility is a specialized research installation at Brookhaven National Laboratory dedicated to developing and testing advanced accelerator and beam physics technologies.
-
C.
Antiproton Accumulator
The Antiproton Accumulator was a storage and cooling ring at CERN designed to collect, cool, and accumulate antiprotons for high-energy proton–antiproton collision experiments.
-
D.
CERN AWAKE experiment beamline
The CERN AWAKE experiment beamline is a dedicated facility at CERN that studies proton-driven plasma wakefield acceleration to develop next-generation high-gradient particle accelerators.
-
E.
SPS Heavy Ion and Neutrino Experiment
The SPS Heavy Ion and Neutrino Experiment (NA61/SHINE) is a fixed-target particle physics experiment at CERN’s Super Proton Synchrotron that studies hadron production in proton, pion, and ion collisions for strong-interaction physics and neutrino beam characterization.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: CASPAR accelerator experiment Triple: [Sanford Underground Research Facility, hostsExperiment, CASPAR accelerator experiment]
Generated description
The CASPAR accelerator experiment is a low-energy nuclear astrophysics project designed to study stellar fusion reactions by accelerating particles in a deep underground laboratory environment.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: CASPAR accelerator experiment Target entity description: The CASPAR accelerator experiment is a low-energy nuclear astrophysics project designed to study stellar fusion reactions by accelerating particles in a deep underground laboratory environment.
-
A.
Continuous Electron Beam Accelerator Facility
The Continuous Electron Beam Accelerator Facility is a high-energy physics research installation that provides continuous beams of electrons for probing the structure of nuclear matter.
-
B.
Accelerator Test Facility
The Accelerator Test Facility is a specialized research installation at Brookhaven National Laboratory dedicated to developing and testing advanced accelerator and beam physics technologies.
-
C.
Antiproton Accumulator
The Antiproton Accumulator was a storage and cooling ring at CERN designed to collect, cool, and accumulate antiprotons for high-energy proton–antiproton collision experiments.
-
D.
CERN AWAKE experiment beamline
The CERN AWAKE experiment beamline is a dedicated facility at CERN that studies proton-driven plasma wakefield acceleration to develop next-generation high-gradient particle accelerators.
-
E.
SPS Heavy Ion and Neutrino Experiment
The SPS Heavy Ion and Neutrino Experiment (NA61/SHINE) is a fixed-target particle physics experiment at CERN’s Super Proton Synchrotron that studies hadron production in proton, pion, and ion collisions for strong-interaction physics and neutrino beam characterization.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85ccc84388190aa151e5173370c8d |
completed | April 10, 2026, 2:13 a.m. |
| NER | Named-entity recognition | batch_69ded715db408190b44e8a8452c79764 |
completed | April 15, 2026, 12:08 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69fe969842848190a030db797c851fed |
completed | May 9, 2026, 2:06 a.m. |
| NEDg | Description generation | batch_69fe983820f88190843361b0ac391d38 |
completed | May 9, 2026, 2:13 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69fe98b18ab48190b2a47418904e6643 |
completed | May 9, 2026, 2:15 a.m. |
Created at: April 10, 2026, 2:53 a.m.