Triple

T14990935
Position Surface form Disambiguated ID Type / Status
Subject Main Ring (Fermilab) E373832 entity
Predicate instanceOf P0 FINISHED
Object proton synchrotron C2614 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: proton synchrotron
Context triple: [Main Ring (Fermilab), instanceOf, proton synchrotron]
  • A. synchrotron chosen
    A synchrotron is a circular particle accelerator that uses synchronized magnetic and electric fields to accelerate charged particles to high energies along a fixed, ring-shaped path.
  • B. circular particle accelerator
    A circular particle accelerator is a device that uses magnetic fields to guide charged particles around a closed loop while electric fields repeatedly increase their energy for high-speed collisions or experiments.
  • C. particle accelerator complex
    A particle accelerator complex is an integrated facility comprising accelerators, beamlines, detectors, and support infrastructure designed to accelerate charged particles to high energies for research, medical, or industrial applications.
  • D. antiproton decelerator ring
    An antiproton decelerator ring is a circular accelerator facility designed to slow down high-energy antiprotons to low energies suitable for precision experiments in antimatter physics.
  • E. particle accelerator
    A particle accelerator is a machine that uses electromagnetic fields to propel charged particles to high speeds and direct them into beams for research, medical, or industrial applications.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85ccc84388190aa151e5173370c8d completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 2:53 a.m.