Triple

T14986106
Position Surface form Disambiguated ID Type / Status
Subject Holmes County Public Library E373704 entity
Predicate instanceOf P0 FINISHED
Object library system branch C18898 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: library system branch
Context triple: [Holmes County Public Library, instanceOf, library system branch]
  • A. public library system
    A public library system is an organized network of libraries, resources, services, and policies that manages the acquisition, cataloging, circulation, and access to informational and cultural materials for a community.
  • B. OSS branch
    An OSS branch is a parallel line of development in an open-source software repository where changes can be made, tested, and reviewed independently before being merged into the main codebase.
  • C. branch chosen
    A branch is a subordinate division or offshoot of a larger structure, system, or organization that extends its reach or function while remaining connected to the whole.
  • D. specialized branch library
    A specialized branch library is a smaller, focused extension of a main library system that concentrates on a particular subject area, user group, or service type while providing targeted collections and expertise.
  • E. support branch
    A support branch is a temporary code line created from a stable base to isolate, develop, and deliver urgent fixes or minor updates without disrupting ongoing mainline or feature development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85ccc84388190aa151e5173370c8d completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 2:52 a.m.