Triple

T14984986
Position Surface form Disambiguated ID Type / Status
Subject Miller House E373677 entity
Predicate instanceOf P0 FINISHED
Object landmark of modern architecture C6817 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: landmark of modern architecture
Context triple: [Miller House, instanceOf, landmark of modern architecture]
  • A. Streamline Moderne building
    A Streamline Moderne building is a late Art Deco architectural form characterized by smooth, curving surfaces, horizontal lines, nautical or aerodynamic motifs, and minimal ornamentation that evoke speed and modernity.
  • B. modernist architectural work chosen
    A modernist architectural work is a building or structure characterized by functional design, minimal ornamentation, and the expressive use of modern materials and technologies to embody the principles of simplicity, clarity, and rationality.
  • C. modernist architecture work
    A modernist architecture work is a building or structure characterized by minimalist forms, functional design, and the use of modern materials and construction techniques, often rejecting historical ornamentation.
  • D. modernist architecture movement
    The modernist architecture movement is a 20th-century design approach that emphasizes functional forms, minimal ornamentation, and the honest expression of materials and structure in response to industrialization and new technologies.
  • E. contemporary architecture
    Contemporary architecture is a style of building design characterized by innovative forms, advanced materials and technologies, sustainable practices, and an emphasis on functionality and integration with the surrounding environment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85ccc84388190aa151e5173370c8d completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 2:52 a.m.