Triple
T14982833
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Demologos |
E373622
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | experimental naval vessel |
C25013
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: experimental naval vessel Context triple: [Demologos, instanceOf, experimental naval vessel]
-
A.
exploration vessel
An exploration vessel is a specialized craft designed to travel into unknown or remote regions to gather data, conduct research, and support long-duration exploratory missions.
-
B.
naval ship
chosen
A naval ship is a large, specially designed vessel operated by a nation's navy for military purposes such as defense, power projection, and maritime security.
-
C.
commissioned vessel
A commissioned vessel is a ship or boat that has been formally placed into active service by an authorized organization, typically a navy or government agency, under an official commission.
-
D.
naval auxiliary ship
A naval auxiliary ship is a non-combat vessel that supports naval operations by providing services such as supply, repair, transport, and logistical assistance to combat ships and shore facilities.
-
E.
exploration ship
An exploration ship is a specialized vessel designed to travel into unknown or remote regions to gather data, conduct research, and expand knowledge about new environments or phenomena.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d85ccbbcd48190acb56e7cf104d8ad |
completed | April 10, 2026, 2:13 a.m. |
Created at: April 10, 2026, 2:52 a.m.