Triple

T14967135
Position Surface form Disambiguated ID Type / Status
Subject Downtown Seattle Transit Tunnel E373218 entity
Predicate instanceOf P0 FINISHED
Object transit tunnel C5444 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: transit tunnel
Context triple: [Downtown Seattle Transit Tunnel, instanceOf, transit tunnel]
  • A. transportation tunnel
    A transportation tunnel is an underground or enclosed passageway designed to allow vehicles, trains, or pedestrians to travel safely through or beneath natural or man-made obstacles.
  • B. road tunnel
    A road tunnel is an underground or enclosed passageway constructed to allow vehicular traffic to pass through obstacles such as mountains, hills, or urban areas while maintaining a continuous roadway.
  • C. rail tunnel chosen
    A rail tunnel is an underground or enclosed passage constructed to allow trains to travel through obstacles such as mountains, hills, or urban areas while maintaining a continuous railway route.
  • D. roadway underpass
    A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
  • E. bridge–tunnel complex
    A bridge–tunnel complex is an integrated transportation structure that combines bridge spans and underwater tunnels to carry traffic across wide bodies of water or other large obstacles.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85ccbbcd48190acb56e7cf104d8ad completed April 10, 2026, 2:13 a.m.
Created at: April 10, 2026, 2:47 a.m.