Triple

T14962009
Position Surface form Disambiguated ID Type / Status
Subject FIS Alpine World Ski Championships 1978 E373085 entity
Predicate eventIncluded P58905 FINISHED
Object men's downhill LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: men's downhill | Statement: [FIS Alpine World Ski Championships 1978, eventIncluded, men's downhill]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: eventIncluded
Context triple: [FIS Alpine World Ski Championships 1978, eventIncluded, men's downhill]
  • A. eventIn
    Indicates that an event occurs within, or is situated in, a specific location, context, or larger event.
  • B. includesEvents chosen
    Indicates that one entity contains or encompasses one or more events as part of its scope or composition.
  • C. multiEventsIncluded
    Indicates that multiple distinct events are collectively contained within, or form part of, a larger event set or grouping.
  • D. eventUse
    Indicates that an event involves the use or utilization of a particular entity (e.g., a resource, tool, or method) as part of its occurrence.
  • E. eventStatus
    Indicates the current state or phase of an event within its lifecycle (e.g., planned, ongoing, completed, or canceled).
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d85cca979481908747d2a81eba1cea completed April 10, 2026, 2:13 a.m.
NER Named-entity recognition batch_69ded6cece6881908cd8c8fe41583bee completed April 15, 2026, 12:07 a.m.
PD Predicate disambiguation batch_69de9a5d995881909e33658f5aea5582 completed April 14, 2026, 7:49 p.m.
Created at: April 10, 2026, 2:40 a.m.